Substations · Gensets · Control Rooms

Block Containers for the Power Sector

Containerized transformer substations, diesel generator shelters and control rooms. Explosion-proof design available where the site requires it.

💰 from 900,000 KZT
4–6 weeks
Explosion protection to TR CU 012/2011
ℹ️
Our power-sector clients include Samruk-Energy, KEGOC and Kazatomprom. We supply genset shelters for oil and gas fields, wind farms and mining sites.

What Power Companies Order

TypeSizePrice (equipment not included)
Shelter for a diesel generator set up to 100 kW3×3 m or 2.435×6 mfrom 900,000 KZT
Shelter for a 100–500 kW diesel generator set2.435×6 m or 2.435×7.3 mfrom 1,800,000 KZT
Containerized transformer substation2.435×6 m or 2.435×7.3 mfrom 2,500,000 KZT
Control / dispatch room2.435×6 mfrom 1,200,000 KZT

Design Features for Power Applications

Upgraded Ventilation

Genset exhaust extraction and equipment cooling sized to the rated output of the unit.

Oil Drip Pan

Fitted under the genset — as required by fire-safety rules for facilities housing internal combustion engines.

Cable Entries to Your Spec

Sealed cable glands and cable channels matched to your site's specific connection diagram.

Explosion Protection When Required

Built to TR CU 012/2011 — for sites at oil and gas fields and other hazardous areas.

Related Articles

Completed Projects

📁
Power-sector projects are listed in our general catalogue of completed work. See projects →

Frequently Asked Questions

How much does a containerized transformer substation cost? +
A containerized transformer substation (equipment not included) starts from 2,500,000 KZT. A shelter for a diesel generator set up to 100 kW — from 900,000 KZT; for 100–500 kW — from 1,800,000 KZT. A control/dispatch room — from 1,200,000 KZT. Production takes 4–6 weeks.
Is an explosion-proof version available for power facilities? +
Yes — an explosion-proof design compliant with TR CU 012/2011 is available where required, for sites at oil and gas fields and other hazardous areas.
Which power-sector companies have already ordered containers? +
Our power-sector clients include Samruk-Energy, KEGOC and Kazatomprom. We supply genset shelters for oil and gas fields, wind farms and mining sites.

Need a Container for a Power Facility?

Tell us the equipment type and output — we'll calculate the price and lead time within 2 working days.