Lesson 07 of 10

Insulation and building envelope

The wall, roof and floor work as a system. Insulation thickness alone does not prove the required thermal performance.

What you will be able to do after this lesson

You will be able to describe the building envelope so that proposals are compared by composition rather than by a single thickness figure.

Why it matters

Two proposals stating “100 mm insulation” can differ several times over: mineral wool density, presence of a vapor barrier, thermal bridges through the frame, joint airtightness, floor and roof construction. That is why the spec describes each assembly separately: wall, floor, roof, windows and doors, joints.

The INTERMODULE website lists mineral wool as the default: it is non-combustible, and it is its thickness that the design engineer selects for the region. Other insulation materials are available as an option on request, and then it is important to check the fire hazard class of the panel, because the building's class depends on it.

For wet rooms, materials and details are specified for moisture and cleaning: floor, lower part of the walls, water drainage. This is a separate line in the spec, not “a standard toilet room”.

Cross-section of a mineral wool sandwich panel at the INTERMODULE plant
Panel density, installation and joints matter as much as thickness
Three series of INTERMODULE block containers
ParameterBudgetStandardProject
Framepainted steel 2 mmcold-formed galvanized profile 2,5 mm, hot-dip galvanized fittingsengineered for the loads in the specification
Wallsbattens with mineral wool, OSB insidethree-layer sandwich panels with basalt coreper specification
FloorOSB 18 mmcement-bonded board 20 mmper specification
Electricssurface wiringconcealed wiring, LED lightingper design
Storeys1up to 3per design
Transportassembled, 2 modules per truckknock-down, 4–8 modules per truckper design

How to apply this on a project

  1. Step 1. Specify the construction of walls, floor and roof separately.
  2. Step 2. Account for thermal bridges through the frame, joints, doors and windows.
  3. Step 3. The vapor barrier, wind barrier and airtightness must match the chosen construction.
  4. Step 4. For wet rooms, specify materials and details designed for moisture and cleaning.

Typical mistake

Comparing proposals by mineral wool thickness alone, ignoring density, details, frame and airtightness.

Check before the next step

  • Walls specified
  • Floor specified
  • Roof specified
  • Windows and doors defined
  • Joints and sealing addressed

Related materials and tools

Apply the lesson to your project

Gather the input data and record the unknown parameters as questions for approval. We prepare a calculation based on the questionnaire within 1 working day.

Fill in the questionnaire (in Russian)