Installation of modular buildings in Kazakhstan
Installation is a separate project stage with its own logistics, equipment, responsibility and quality control. We look at what the works include and what to check with the contractor.
Sequence
From the site to handover
01
Site readiness
Access roads, foundation, levels, crane area and temporary utilities.
02
Unloading
Vehicle arrival sequence, rigging, lifting plan and storage.
03
Joining
Geometry, inter-module connections, sealing, roof and facade.
04
Building systems and handover
Connections, tests, punch list, as-built documentation and handover of the facility.
Before the contract
What to clarify with the installation contractor
Construction license
Availability and category for the required types of work.
Availability and category for the required types of work.
In-house team
Who actually performs the installation and utility connections.
Who actually performs the installation and utility connections.
Work execution plan
Whether there is a method statement and a lifting plan.
Whether there is a method statement and a lifting plan.
Responsibility
Who is responsible for damage, geometry and inter-module joints.
Who is responsible for damage, geometry and inter-module joints.