Installation of modular buildings in Kazakhstan

Installation is a separate project stage with its own logistics, equipment, responsibility and quality control. We look at what the works include and what to check with the contractor.

Sequence

From the site to handover

01

Site readiness

Access roads, foundation, levels, crane area and temporary utilities.

02

Unloading

Vehicle arrival sequence, rigging, lifting plan and storage.

03

Joining

Geometry, inter-module connections, sealing, roof and facade.

04

Building systems and handover

Connections, tests, punch list, as-built documentation and handover of the facility.

Before the contract

What to clarify with the installation contractor

Construction license
Availability and category for the required types of work.
In-house team
Who actually performs the installation and utility connections.
Work execution plan
Whether there is a method statement and a lifting plan.
Responsibility
Who is responsible for damage, geometry and inter-module joints.