
Shift worker camp for Kazpako LLP — Prorva field
Residential modules, canteen and sanitary blocks for shift personnel at the Prorva oil field in Western Kazakhstan. Built for the local climate and site requirements.
Worker camps, administrative complexes, medical modules and industrial buildings for leading companies across Kazakhstan and the CIS. Every project delivered turnkey, with warranty.

Residential modules, canteen and sanitary blocks for shift personnel at the Prorva oil field in Western Kazakhstan. Built for the local climate and site requirements.

160 residential modules (2-person), 180-seat canteen, 2-room medical post, 20-person bathhouse, laundry, checkpoint. 200mm insulation. Climate: −42°C.

75 residential modules, 100-seat canteen, medical post, bathhouse, gym. Special marine-climate version with enhanced anti-corrosion protection.

40 residential modules, 50-seat canteen, sauna, medical post. Installed in a remote area — delivered by helicopter and road transport. 14-day installation.

Supply of 120 additional residential modules to expand an existing camp at the TCO site. ATEX-rated, custom client specifications. 3-week delivery.

Residential modules, canteen, bathhouse, medical post for a mining and processing plant. Built to enhanced fire-safety requirements for industrial mine sites.

Residential modules, canteen, bathhouse, laboratory, equipment storage. Demountable design for repeated relocation. 7-day installation.

Single-storey modular building assembled from INTERMODULE block containers: dark grey facade, PVC windows, turnkey installation on a prepared foundation.

Checkpoint with two barrier gates, vandal-resistant construction, Class A2 bulletproof glass, 8-camera CCTV, access control system. Climate: −42°C.

Feldsher-obstetric posts with 3 rooms each: reception, treatment, examination. Autonomous power supply, toilet, washroom. 12 units delivered in 6 weeks.

3-room medical post + 2-bed isolation ward + washroom. Fitted with client-supplied medical equipment. Complies with sanitary regulations, certified by the public health service.

Rapidly deployable medical complex: reception ward, 2 patient rooms, operating theatre, pharmacy. 72-hour autonomous power supply. 10 days from order to handover.