Kazakhstan Market · Document flow
Documents for a modular project
A single document package reduces questions, recalculations and incomparable commercial proposals. Here is the document flow structure from the first request to the as-built documentation.
From request to handover
Minimum digital framework of a project
01
Questionnaire / specification
Input data, purpose, climate, building systems and scope of supply.
02
Request for proposal and supplier document list
Price request and the list of documents the supplier must issue.
03
Technical queries and approvals
Managing questions, revisions and technical deviations.
04
Quality control, factory acceptance and as-built documentation
Quality control, factory acceptance and the as-built package.
Basic set
What is worth standardizing
Document register
A single list of documents and revisions.
A single list of documents and revisions.
Responsibility matrix
Who is responsible for each interface between the factory, the design and the site.
Who is responsible for each interface between the factory, the design and the site.
Inspection and test plan and factory acceptance
Hold points and factory acceptance.
Hold points and factory acceptance.
Module passport
Serial number, materials, drawings and inspection results.
Serial number, materials, drawings and inspection results.
Continue with the Kazakhstan Market
Open the central overview to go to manufacturers, design, installation, prices, imports and documents.